671 - Goulburn Giles Court Redevelopment
近期公告
  • 19th 五月 2025, UPCOMING WORKS THIS WEEK: 19-23rd May



    Cutting of floors & trenches for drainage works & wet areas

    in ground pipe install

    floor grinding prepping

    demo detailing

    A/C De lap & modifications to existing duct




    KEY HAZARDS:

    Saw cutting to concrete floor

    Open trench's and wet areas internally

    Hazardous Manual Tasks,

    Slips, Trips and Falls, Falling

    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab ( Actioned )


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hi vis and
    safety boots

    NO SMOKING ONSITE:
    This includes smoking in front & back of the building !!!

    附件 :
    Sawcutting & Concrete Removal Mark-up.pdf
    250517 Services Search Report Giles Court.pdf
  • 06th 五月 2025, WEEKLY BULLETIN GILES COURT 05-05-25

    UPCOMING WORKS THIS WEEK:


    Structural install of framing & bracing in ceiling void

    Timber noggin to existing walls

    cutting off floors & trenches for drainage works

    floor grinding prepping

    ongoing demo detailing throughout




    KEY HAZARDS:


    Hazardous Manual Tasks,
    Slips, Trips and Falls, Falling
    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hi vis and
    safety boots

    NO SMOKING ONSITE:
    This includes smoking in front & back of the building !!!

  • 22nd 四月 2025, WEEKLY BULLETIN 22-04-25

    UPCOMING WORKS THIS WEEK:

    NOTE:

    PART OF BLADE WALL TO BE LEFT STANDING ON EASTERN SIDE OF BLD FOR TEMP SUPPORT TO EXTERIOR WALL


    Demo of internal walls, removal of ceiling insulation , door openings etc


    KEY HAZARDS:

    BRICK WALL , HOLDING UP ROOF VALLEY DO NOT REMOVE UNLESS APPROVED BY PBG


    Hazardous Manual Tasks,
    Slips, Trips and Falls, Falling
    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hivis and
    safety boots

    NO SMOKING ONSITE:

    Client has requested that workers don,t smoke in-front of job site (Bradley st )
    Do so, ON THE OPPOSITE SIDE of the road
    thank you for your cooperation

现场天气预报
当前现场天气

最近更新: 18:21
温度: 17C (应用程序 17C)
风速: 9KMH
最大 风: 9KMH @18:21
自上午9点开始降雨: 0.8mm


观测信息来自 - Bureau of Meteorology
观测位置 - Goulburn、NEW SOUTH WALES
时区 - 澳大利亚东部标准时间
预测 - 星期五、16 一月

Showers.
最低: 14C 最大: 20C
可能有雨。: 80%
预计降雨: 1 至 20mm


预测信息来自 - Bureau of Meteorology
预测位置 - Goulburn、NEW SOUTH WALES
时区 - 澳大利亚东部标准时间
明天 - 星期六, 17 一月

Shower or two.
最低: 13C 最大: 20C
可能有雨。: 70%
预计降雨: 0 至 5mm


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

;