671 - Goulburn Giles Court Redevelopment
Buletine recente
  • 19th mai 2025, UPCOMING WORKS THIS WEEK: 19-23rd May



    Cutting of floors & trenches for drainage works & wet areas

    in ground pipe install

    floor grinding prepping

    demo detailing

    A/C De lap & modifications to existing duct




    KEY HAZARDS:

    Saw cutting to concrete floor

    Open trench's and wet areas internally

    Hazardous Manual Tasks,

    Slips, Trips and Falls, Falling

    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab ( Actioned )


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hi vis and
    safety boots

    NO SMOKING ONSITE:
    This includes smoking in front & back of the building !!!

    Anexe :
    Sawcutting & Concrete Removal Mark-up.pdf
    250517 Services Search Report Giles Court.pdf
  • 06th mai 2025, WEEKLY BULLETIN GILES COURT 05-05-25

    UPCOMING WORKS THIS WEEK:


    Structural install of framing & bracing in ceiling void

    Timber noggin to existing walls

    cutting off floors & trenches for drainage works

    floor grinding prepping

    ongoing demo detailing throughout




    KEY HAZARDS:


    Hazardous Manual Tasks,
    Slips, Trips and Falls, Falling
    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hi vis and
    safety boots

    NO SMOKING ONSITE:
    This includes smoking in front & back of the building !!!

  • 22nd aprilie 2025, WEEKLY BULLETIN 22-04-25

    UPCOMING WORKS THIS WEEK:

    NOTE:

    PART OF BLADE WALL TO BE LEFT STANDING ON EASTERN SIDE OF BLD FOR TEMP SUPPORT TO EXTERIOR WALL


    Demo of internal walls, removal of ceiling insulation , door openings etc


    KEY HAZARDS:

    BRICK WALL , HOLDING UP ROOF VALLEY DO NOT REMOVE UNLESS APPROVED BY PBG


    Hazardous Manual Tasks,
    Slips, Trips and Falls, Falling
    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hivis and
    safety boots

    NO SMOKING ONSITE:

    Client has requested that workers don,t smoke in-front of job site (Bradley st )
    Do so, ON THE OPPOSITE SIDE of the road
    thank you for your cooperation

Prognoza meteo șantier
Condiții meteo curente la șantier

Ultima actualizare la: 18:21
Temperatură: 17C (Aplicație 17C)
Viteza vântului: 9KMH
Max. Vânt: 9KMH @18:21
Ploaie de la 9 AM: 0,8mm


Observație obținută de la - Bureau of Meteorology
Locație observație - Goulburn, NEW SOUTH WALES
Fus orar - Ora standard a Australiei Orientale
Prognoză - vineri, 16 ianuarie

Showers.
Min: 14C Max: 20C
Șanse de ploaie: 80%
Precipitații așteptate: 1 la 20mm


Prognoză obținută de la - Bureau of Meteorology
Locație prognoză - Goulburn, NEW SOUTH WALES
Fus orar - Ora standard a Australiei Orientale
Mâine - sâmbătă, 17 ianuarie

Shower or two.
Min: 13C Max: 20C
Șanse de ploaie: 70%
Precipitații așteptate: 0 la 5mm


Documente importante aferente locației
Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Nou în locație?

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

;