671 - Goulburn Giles Court Redevelopment
最近のニュースレター
  • 19th 5月 2025, UPCOMING WORKS THIS WEEK: 19-23rd May



    Cutting of floors & trenches for drainage works & wet areas

    in ground pipe install

    floor grinding prepping

    demo detailing

    A/C De lap & modifications to existing duct




    KEY HAZARDS:

    Saw cutting to concrete floor

    Open trench's and wet areas internally

    Hazardous Manual Tasks,

    Slips, Trips and Falls, Falling

    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab ( Actioned )


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hi vis and
    safety boots

    NO SMOKING ONSITE:
    This includes smoking in front & back of the building !!!

    添付ファイル :
    Sawcutting & Concrete Removal Mark-up.pdf
    250517 Services Search Report Giles Court.pdf
  • 06th 5月 2025, WEEKLY BULLETIN GILES COURT 05-05-25

    UPCOMING WORKS THIS WEEK:


    Structural install of framing & bracing in ceiling void

    Timber noggin to existing walls

    cutting off floors & trenches for drainage works

    floor grinding prepping

    ongoing demo detailing throughout




    KEY HAZARDS:


    Hazardous Manual Tasks,
    Slips, Trips and Falls, Falling
    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hi vis and
    safety boots

    NO SMOKING ONSITE:
    This includes smoking in front & back of the building !!!

  • 22nd 4月 2025, WEEKLY BULLETIN 22-04-25

    UPCOMING WORKS THIS WEEK:

    NOTE:

    PART OF BLADE WALL TO BE LEFT STANDING ON EASTERN SIDE OF BLD FOR TEMP SUPPORT TO EXTERIOR WALL


    Demo of internal walls, removal of ceiling insulation , door openings etc


    KEY HAZARDS:

    BRICK WALL , HOLDING UP ROOF VALLEY DO NOT REMOVE UNLESS APPROVED BY PBG


    Hazardous Manual Tasks,
    Slips, Trips and Falls, Falling
    Objects, Cuts and Abrasions,
    Use of Electrical Tools and
    Equipment, Dust, etc
    Exposure to Respirable
    Crystalline Silica (RCS) –
    inhaling RCS can lead to
    silicosis



    DISCONNECTIONS :

    ACTION-ED PRIOR TO DEMO

    water --YES
    power---YES
    fire --YES
    security---YES
    A/c ---YES


    SERVICES INVESTIGATIONS:

    For new wet area connections to existing below floor slab


    UNDERGROUND SERVICES :

    Before carrying out any underground work, locate services using
    Before You Dig Australia, a services locator, non-destructive potholing, potholing by hand
    and by taking the other precautions identified in the Code of Practice: Work in the Vicinity of
    Overhead and Underground Electric Lines



    PERMITS:

    Permits are required to be uploaded on hammertech ready for approval prior to any works commencing onsite

    FOR:

    Demolition
    Hot works
    Excavation / cutting / coring etc



    ELECTRICAL SAFETY:

    Temp boards in place for the construction works :

    Treat all cables as live if in doubt ASK !
    Ensure all leads / tools are tagged


    HOUSEKEEPING:

    It is everyone's responsibility to insure lunch room & toilets are kept clean.

    Ensure everyone places there food / rubbish in the bins and not thrown around site road or gardens

    Ensure your work area is cleaned everyday prior to leaving site.

    PLANT & EQUIPMENT:

    Please ensure all plant is uploaded on hammertech ready for approval prior to bringing to site


    WHEN LOADING OUT DURING DEMO BE AWARE :

    collision/striking with other
    plant driving around the site
    workers or public on foot
    Spotter to be inplace
    bunt of work areas where required


    SITE RULES & PPE REQUIREMENTS:

    Park is at the front of the job, keep access clear for residents,
    Ensure you are always wearing the site requirements PPE which is Hardhat, hivis and
    safety boots

    NO SMOKING ONSITE:

    Client has requested that workers don,t smoke in-front of job site (Bradley st )
    Do so, ON THE OPPOSITE SIDE of the road
    thank you for your cooperation

現場天気予報
現在の現場の天気

最終更新日時: 18:21
温度: 17C (アプリ 17C)
風速: 9KMH
最大風速: 9KMH @18:21
午前9時からの雨: 0.8mm


観察元 - Bureau of Meteorology
観察場所 - Goulburn, NEW SOUTH WALES
タイムゾーン - オーストラリア東部標準時
予測 - 金曜日, 16 1月

Showers.
: 14C マックス: 20C
降雨の可能性: 80%パーセント
予想降雨量: 1 に 20mm


予測の出典 - Bureau of Meteorology
予測場所 - Goulburn, NEW SOUTH WALES
タイムゾーン - オーストラリア東部標準時
明日 - 土曜日, 17 1月

Shower or two.
: 13C マックス: 20C
降雨の可能性: 70%パーセント
予想降雨量: 0 に 5mm


重要な現場書類
現場に初めてですか?

この現場のPPE要件を知っていますか?

現場での初日に備えて、適切な安全装備を確保してください。

現場のPPE要件を表示

現場に到着したら、すぐに作業を開始できます。

ご都合の良い時にオンラインで現場登録を完了し、時間を節約してください。

登録を開始

現場に初めてですか?

この現場のPPE要件を知っていますか?

現場での初日に備えて、適切な安全装備を確保してください。

現場のPPE要件を表示

現場に初めてですか?

現場に到着したら、すぐに作業を開始できます。

ご都合の良い時にオンラインで現場登録を完了し、時間を節約してください。

登録を開始

;