695 - Gaden 2.0 New Hatchery - Herkese Açık Proje Sahası
-
02nd Mart 2026, HSEQ Prestart
Civil works underway, excavators and truck movement on site. Keep clear of machinery.
Hard hats and high vis clothing to be worn
Use skips for sorted rubbish - general, steel, concrete.
Asbestos pipes are present throughout the Hatchery infrastructure. Notify Site Manager if works are required adjacent to existing pipes.
High UV, use Sunscreen.
Slips, Trips, Falls- take care around excavations, services location potholes.
Unpredictable strong wind gusts occur. Ensure loose items and rubbish skip tarp is secured.
Overhead power line to power pole adjacent to blue shipping container.
Geçerli Saha Hava Durumu
Son Güncelleme Saati: 19:31
Sıcaklık: 13C (App 10C)
Rüzgar Hızı: 9KMH
Maks. Rüzgar: 33KMH @16:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: -2C @06:36
Maks Sıcaklık: 21C @13:03
Bora: 26KMH
Maks Bora: 41KMH @16:21
Gözlem Konumu - Cooma Airport, NEW SOUTH WALES
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Perşembe, 16 Nisan
Shower or two.
Min: 10C Maks: 17C
Yağmur İhtimali: 50%
Beklenen Yağmur: 0 kime 1mm
Tahmin Konumu - Jindabyne, NEW SOUTH WALES
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Cuma, 17 Nisan
Sunny.
Min: 2C Maks: 15C
Yağmur İhtimali: 5%
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.