695 - Gaden 2.0 New Hatchery - Offentlig prosjektsted
-
02nd mars 2026, HSEQ Prestart
Civil works underway, excavators and truck movement on site. Keep clear of machinery.
Hard hats and high vis clothing to be worn
Use skips for sorted rubbish - general, steel, concrete.
Asbestos pipes are present throughout the Hatchery infrastructure. Notify Site Manager if works are required adjacent to existing pipes.
High UV, use Sunscreen.
Slips, Trips, Falls- take care around excavations, services location potholes.
Unpredictable strong wind gusts occur. Ensure loose items and rubbish skip tarp is secured.
Overhead power line to power pole adjacent to blue shipping container.
Vær på anleggsted
Sist oppdatert kl.: 19:31
Temperatur: 13C (App 10C)
Vindfart: 9KMH
Maks. Vind: 33KMH @16:21
Regn side 09.00: 0,0mm
Min. temperatur: -2C @06:36
Maks. temperatur: 21C @13:03
Vindkast: 26KMH
Maks. vindkast: 41KMH @16:21
Observasjonssted - Cooma Airport, NEW SOUTH WALES
Tidssone - austaustralsk standardtid
Værmelding – torsdag, 16 april
Shower or two.
Min.: 10C Maks.: 17C
Sjanse for regn: 50%
Forventet nedbør: 0 til 1mm
Sted for værmelding – Jindabyne, NEW SOUTH WALES
Tidssone - austaustralsk standardtid
I morgen - fredag, 17 april
Sunny.
Min.: 2C Maks.: 15C
Sjanse for regn: 5%
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.