695 - Gaden 2.0 New Hatchery - Openbare Project Locatie
-
02nd maart 2026, HSEQ Prestart
Civil works underway, excavators and truck movement on site. Keep clear of machinery.
Hard hats and high vis clothing to be worn
Use skips for sorted rubbish - general, steel, concrete.
Asbestos pipes are present throughout the Hatchery infrastructure. Notify Site Manager if works are required adjacent to existing pipes.
High UV, use Sunscreen.
Slips, Trips, Falls- take care around excavations, services location potholes.
Unpredictable strong wind gusts occur. Ensure loose items and rubbish skip tarp is secured.
Overhead power line to power pole adjacent to blue shipping container.
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 19:31
Temperatuur: 13C (App 10C)
Windsnelheid: 9KM/U
Max. Wind: 33KM/U @16:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: -2C @06:36
Max.temp: 21C @13:03
Windvlaag: 26KM/U
Max. windvlaag: 41KM/U @16:21
Waarneming Locatie - Cooma Airport, NEW SOUTH WALES
Tijdzone - Oost-Australische standaardtijd
Weerbericht - donderdag, 16 april
Shower or two.
Min.: 10C Max.: 17C
Kans op neerslag: 50%
Verwachte regen: 0 tot 1mm
Weerbericht locatie - Jindabyne, NEW SOUTH WALES
Tijdzone - Oost-Australische standaardtijd
Morgen - vrijdag, 17 april
Sunny.
Min.: 2C Max.: 15C
Kans op neerslag: 5%
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.